VELUX skylight modules provide maximum daylight and natural ventilation

The school was equipped with three rows of skylights dating from the 1990s, made of double glazing and aluminium frames, and included manual ventilation and smoke extraction.

The main challenge of this project was therefore to replace this obsolete structure while ensuring automatic ventilation in the building. In addition, the specification also required an integrated smoke extraction solution.

VELUX Modular Skylights ensure comfort in summer and winter. On a typical day, as summer approaches, the school’s thermal analysis results show an average temperature drop of 8.8°C between 8 a.m. and 5 p.m., thanks to natural ventilation (Freecooling). With a Uw of 1.4 W/m².K for thermal insulation in winter, double glazing creates a natural barrier against the cold. Heating consumption decreased by 5% for the entire school and by 38% for the premises directly under the skylight. Convincing results, thanks to a skylight solution that ensures energy savings and comfort for students throughout the year.

Projektinfo


{{property.PropertyName}}

{{pValue.PropertyValue}}

Produkter anvendt i projektet

3 x Rytterlys

Rytterlys 25-40°

Et ovenlys med dobbelt hældning til montering på et fladt tag eller øverst på et saddeltag.

Illustration af løsning med rytterlys - VELUX ovenlysmoduler Læs mere

Antal moduler: 182 standard modules, including 20 smoke extraction modules.

Rytterlys 25-40°

Et ovenlys med dobbelt hældning til montering på et fladt tag eller øverst på et saddeltag.

Illustration af løsning med rytterlys - VELUX ovenlysmoduler Læs mere

Jean-Luc Wiedemann

Wiedemann & Fils

We have been working with VELUX for more than 45 years and this is the first time we have installed this solution. We were trained and assisted throughout the project, directly on the building site.

Nicolas Mazerand

The deadline also determined our choice.

Refurbishment organised during the school holidays

The refurbishment was organised to fit in with the school's schedule, with work carried out quickly over the school holiday period. Installer Wiedemann & Fils completed the job over a six-week period (from 25 July to 1 September) in order to meet the deadline.
Det modulære system

Modulsystemet

Få mere at vide om modularitet, vigtigste fordele og vores samarbejde med Foster + Partners.

Udforsk modulsystemet
Projektsupport til ovenlysmoduler

Vi sidder klar til at hjælpe dig

Vores ovenlysspecialister sidder klar til at rådgive dig igennem hele processen fra design til montering.

Få projektrådgivning

Andre referencer